Amit Raval Resume

This resume is protected by copyright and may not be reproduced in any form without the expressed consent of the owner.
Obtaining this resume from anywhere other than RF Cafe is strictly forbidden. Web Bots are expressly forbidden from collecting resumes from RFCafe.com

AMIT RAVAL
Email ID: amit.n.raval@gmail.com
Ph No: +919819255977
RF OPTIMISER & PLANNER



PROFESSIONAL SYNOPSIS

Bachelor of Electronics 4 and half years of experience in RF domain.
Proficient in GSM Radio Frequency Optimization & Planning of 2G & 2.5G networks.
Widespread knowledge of telecom test equipments including TEMS investigation, MapInfo, MCOM, EXERT, BUSINESS OBJECTS, RNO TOOL (Ericsson), A9155 (Alcatel).
Successfully completed 12 projects in 4 years.
Skilled and motivated with knowledge in GSM technology and can achieve proficiency in any related or specific field in a relatively short time.
Extensive knowledge of Microsoft Excel, Microsoft Word, Windows 98, Windows 2000 and
Windows NT & Windows XP.
Ability to perform quality work within deadlines, with or without direct supervision. Excellent written and oral communications, interpersonal, analytical, abstract reasoning and organizational skills.
Strong analytical skills, ability to meet deadlines, multi-task, and prioritise

WORK EXPERIENCE
April 2003 — till date GTL LIMITED, NAVI MUMBAI, INDIA
ENGINEER-PROJECTS


Project Details
Project Name: Alcatel-Lucent Optimisation
Customer: Alcatel-Lucent West Bengal, India
Project Period: Dec-07 till date
Project Size: 386 Sites, North Bengal region(Swap + New)
Activities Performed:


• Team Lead for overall management, coordination and single point of contact for client.
• Handling a team of 6 engineers inclusive of drive test and optimisation engineers.
• Performance Monitoring and maintaining Kpi for swapped sites from Motorola and new sites.
• Evaluating B9 Parameters and suggesting modifications for poor performing cells.
• Optimising the network cluster wise, using AnaQos Ver. 1.99.
• Preparing Gos report to be sent to end client.
• Working in close co-ordination with drive test teams, OMCR and BSS Project teams, ensuring smooth functioning of entire process.


Project Details
Project Name: Banglalink Swap
Customer: ERICSSON, Bangladesh
Project Period: May 07 to Aug 07
Project Size: Swap of 35 sites
Activities Performed:
• Handling a Team of 3 RF Engineers for swap activity from Siemens & Huawei to Ericsson for 2.5G network of Banglalink, Bangladesh.
• Preparation of CDD for swaps sites with necessary parameters.
• Getting the Post swap and pre swap drive test done for the clutter and analysing the drive logs.
• Site verification after swap and recommending parameters and CDD changes.
• Collection &analysis of statistics from OSS with help of Business Objects and optimising the network for achieving KPI pre swap <= KPI post swap by modifying parameters using RNO Tool.
• Preparing reports as per customer requirement per site and for whole cluster.
• Managing the overall radio related activity by planning drive routes, selecting sites for swap.
• Interacting with client and procuring data and finalizing the responsibilities and scope of work of the operator and Vendor for the activity.


Project Details
Project Name: TMIB DB Tuning and optimisation
Customer: ERICSSON, Bangladesh.
Project Period: June 06 to April 07
Project Size: Dual band tuning in phases for two cities: Dhaka 600 sites, Chittagong 450 sites

Activities Performed:
• Deputed in Dhaka for TMIB (the operator) Multi-Band Optimisation for Ericsson
• Performing optimisation for Multi band sites by setting values for Path-loss criteria like LOL, TAOL, FBOFFSET, DTCB etc using RNO tool.
• Optimising CDD parameters and Cell-to-Cell relation (for handover optimisation) using statistics obtained from Business Objects.
• FLP implementation support. Maintaining the KPI by tuning the Parameters.
• The entire activity is to achieve KPI’s for Multiband and single band sites in terms of call blocking, dropped calls.
• Team lead for Cell Optimisation activity. Scope of work included getting the drive test done using TEMS VER 7.0, report any h/w faults or other abnormal events observed during drive, preparing reports, consistency check as per CDD, taking level and quality plots and recommending changes after analysing the log files.


Project Details
Project Name: Airtel Benchmarking
Customer: Airtel Banglore, India
Project Period: May 06
Project Size: Benchmarking for Airtel with 3 Other GSM players
Activities Performed:
• Benchmarking done for comparison of Airtel’s network with other 3 gsm operators in terms of coverage and quality.
• Roaming test done to check the probability of a MS to latch onto Airtel network when in roaming or when no coverage of service provider is present.
• Preparing reports and coverage, quality, SQI, C/I plots, as per customer requirement with the help of Tems investigation 5.1 and Mapinfo 6.0.


Project Details
Project Name: Mobilis planning
Customer: Mobilis, Algeria
Project Period: Oct 05- April 06
Project Size: 1 major city, Oran & 3 small villayas
Activities Performed:


• Finalising the Nominal cell plan from customer.
• Radio survey and planning for new sites on Ericsson systems.
• Technical site visits and Antenna Planning along with location of shelter, DG and other equipments.
• Approving reports from subcontractors called Avant Project Details.
• Working in close co-ordination with site acquisition department to ensure selection of good candidates.


Project Details
Project Name: Etihad Etisalat Planning
Customer: Alcatel, Saudia
Project Period: Nov-04 to Sep-05
Project Size: North Eastern Region of KSA , 400 plus sites.
Activities Performed:
• Preparing Nominal cell plan with help of planning tool A955.
• Radio surveys and approving of candidates and reports from subcontractors.
• Technical visits for antenna planning and location of other equipments.
• Checking coverage prediction with the help of tool and making presentations to customer and weekly submission of reports.


Project Details
Project Name: Airtel, Hyderabad RF optimisation
Customer: Ericsson Hyderabad, India
Project Period: Sep 04 to Oct 04
Project Size: Cluster optimisation
Activities Performed:
• Analyzing log files ,generating plots and preparing reports with post processing tool
• Identifying and resolving issues like high SDCCH drop, large call drops, TRU failure.
• Drive test and verification of new sites and optimizing them.


Project Details
Project Name: Airtel, Bangalore RF optimisation
Customer: Ericsson Bangalore, India
Project Period: June 04 to Aug-04
Project Size: 800 SITES , 7 BSC
Activities Performed:
• Verification and optimization for new capacity and coverage sites.
• Analyzing log files, generating plots and preparing reports with post processing tool.
• Attending customer complaints for IBS & regarding GPRS
• Walk test for indoor sites.
• Performing drive test during migration from one BSC to another or re-parenting.


Project Details
Project Name: MTNL drive test
Customer: Motorola MUMBAI
Project Period: March 04 to May 04
Project Size: 30 SITES
Activities Performed:
• Drive Test & Data Collection for more than 25 sites in Mumbai India for MTNL
• Drive Test Data analysis, C/I, C/A, Coverage, Call Handover, Call Drop, Rx Quality, SQI etc. and Network performance analysis.
• Decide changes, if any required for network performance improvement & implement the same.
• Performing Customer Acceptance Testing of Network and preparing performance


Project Details
Project Name: Airtel drive test
Customer: Motorola MUMBAI
Project Period: Jan 04 to March 04
Project Size: 150 sites
Activities Performed:
• Radio Network optimization. Maintaining radio network in terms of RXQUAL, RXLEV, and Drop Call Rate etc. RF problem resolution. Database optimizations.
• Able to handle optimization activities alone. Handled 3 BSC’s (approx 150 sites) from Motorola side. Optimization activities typically include change of frequency, changing antenna type, reorientations, tilt, height changes, and relocation as per necessity.
• Radio Site Survey, site selection that includes planning of antenna locations, antenna type height, and azimuth.
• Frequency, BSIC, Neighbour planning for the network cell sites.
• SFH implementation (1x 3, 1 x1, Fractional loading), which include HSN & MAIO planning.
• Drive tests & able to analyze, interpret drive test logs.
• Planning procedure for RF Acceptance Test, execution, generating reports, and preparation of documents for it.


Project Details
Project Name: Hutch Swap
Customer: LCC –Nokia Hyderabad
Project Period: Oct 03 to Dec 03
Project Size: 100 plus sites
Activities Performed:
• Pre Swap Drive tests & able to analyze, interpret drive test logs.
• GPRS testing for the HUTCH network checking data process & PDP.
• Preparing Adjacencies for swap sites & list of parameters to change.
• Post Swap Drive tests & able to analyze, interpret drive test logs.
• Drive test for IBS sites with TOM kit & making reports with SAM (Nokia Analysis & Reporting Software).
• Planning procedure for RF Acceptance Test, execution, generating reports, and preparation of documents for it.


Project Details
Project Name: HUTCHSON MAX(GSM-1800)project radio survey
Customer: Motorola Punjab
Project Period: July 03 to Sep 03
Project Size: Phase 0, 3 Major cities
Activities Performed:
• Radio Survey
• Suggesting changes in Nominal cell plan
• Antenna Planning.
• Working with Los team, Site Acquisition and civil team.


Project Details
Project Name: Tata CDMA RF survey
Customer: Motorola Mumbai & Gujrat ( Surat and Ahmedabad)
Project Period: April 03 to June 03
Project Size: Phase 0 , Metro city Mumbai
Activities Performed:
• Radio Survey
• Suggesting changes in Nominal cell plan
• Antenna Planning.
• Making rough sketches of rooftops showing antenna positions and other equipments and supporting it by respective pictures.
 

EQUIPMENTS, TEST & MEASURING INSTRUMENTS, SOFTWARE & APPLICATION
Test & Measuring Instruments
Drive Test Tool:
• TEMS GSM 3.2 and above
STATSTICAL ANALYSIS TOOL:
• AnaQos Ver 1.99
• Business Objects 5.1
• RNO tool ( Ericsson)

Post Processing Tool:
• Desk CAT
• EXERT 5.0 (Ericsson)
• Smart 8.0.2.2 BSS migration checking tool (Alcatel)
• MCOM
• MapInfo 6.5
• MIPT

Planning Tool:
• A9155 (Alcatel)

 

EDUCATIONAL QUALIFICATION
Educational Qualification
o Bachelor's degree in Electronics Engineering from Mumbai University. 2002.

 

PERSONAL DETAILS
Date of Birth— December 18th 1980
Marital Status: Married
Passport Details
o Passport Number—G4486057
o Issued At—Thane
o Valid Till— September 6th 2017

Driving License details
o Driving License Number: 38865
o Date of issue: 20/10/2001
o Date of expiry: 19/10/2021